Select another criteria

Apprenticeship Registered Apprenticeship Occupation Information


F

Floor Layer (Painter) (Hybrid)
Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering. Cut flooring material to fit around obstructions. Inspect surface to be covered to ensure that it is firm and dry. Trim excess covering materials, tack edges, and join sections of covering material to form tight joint. Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores. Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers. Cut covering and foundation materials, according to blueprints and sketches. Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller. Apply adhesive cement to floor or wall material to join and adhere foundation material. Determine traffic areas and decide location of seams. Add decorative qualities to finished work that enhances the appeal of the building.
Occ
Code
Program NameProgram HoursSponsorRegionDistrict
0199HYFlorida Finishing Trades Institute JATC
FL009142204
4132-6032Albert Trombetta 8Broward
0199HYFlorida Finishing Trades Institute JATC
FL008620001
4132-6032Al Trombetta 5Orange